
-
Architects: Neugebauer + Roesch Architekten
- Area: 10000 m²
- Year: 2019
-
Manufacturers: Abus, Clauss Markisen, Lindner, Nemetschek, Rienth

Text description provided by the architects. After a construction period of only 12 months, the machine building company celebrated the completion of a three-aisled production hall and an adjoining three-storey office wing with training facilities as well as a representative visitor car park in the summer of 2019. Consistent continuation of the architectural concept. With over 3000 employees worldwide, EMAG produces manufacturing systems for precision metal components. The Stuttgart-based architects had already completed a joint production hall and office building on the company grounds in Salach close to Göppingen at the beginning of 2003. The shop floor and offices are immediately connected. This concept of a direct link between administration, production and logistics has been reapplied in the south extension of the EMAG headquarters. The exterior finish also reflects the continuation of the architectural concept: the new production hall has been clad with the same horizontally fixed trapezoidal sheet as the existing halls; the aluminium and glass curtain wall of the office wing continues the facade design of the existing building immediately next door.






















